Cobod prints first 3D house in Borneo

By Catrin Jones01 November 2022

Large concrete pre-casting company Sarawak Consolidated Industries Berhad (SCIB) recently revealed their first 3D printed demo house in Sarawak, Borneo.

The house is located in Sarawak, Borneo (Photo: Cobod)

The house is said to consist of a built area of 1000 sq ft (90 m2), had a total printing time of 46 hours and was 3D printed using the BOD2 3D construction printer from Denmark-based Cobod International.

Cobod says that the total length of the print was over 9km and were extruded layer by layer on top of each other in a total of 145 layers each of 2cm height.

Simon Klint Bergh, head of Asia-Pacific for Cobod, said, “When we created Cobod, we never envisaged, that we would have a market in a place like Borneo. The fact that our technology is now applied there shows, that the market for our technology is endless. When we can sell our printers in Borneo, we can sell them anywhere”.

The new 3D printed house in Borneo is located on the premises of the Malaysian Construction Industry Development Board (CIDB), which is the permitting body in Malaysia, at their training arm premises Malaysian Construction Academy (ABM) in Kuching, Sarawak (Malaysia) and was built in collaboration with the agency.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Construction Technology Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
How technology can advance modular construction
Modular construction can play a role in the industry becoming more sustainable, and tech can turbocharge this process, says Eva Carranza, Hexagon’s Global Director ESG & Sustainability
Rapid tech adoption and optimism at heart of global construction
KPMG survey reveals sector’s increased takeup of robotic process automation, virtual reality, project management information systems (PIMS), drones, smart sensors and AI
B2W Software expands alerts and notifications capabilities
New features from a Trimble company lets contractors communicate automatically and in real time
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: andy.brown@khl.com
Mike Hayes Editor, Construction Europe Tel: +44 (0)1892 786 231 E-mail: mike.hayes@khl.com
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: catrin.jones@khl.com
Eleanor Shefford Sales Manager Tel: +44 (0)1892 786236 E-mail: eleanor.shefford@khl.com
CONNECT WITH SOCIAL MEDIA