New construction lab promises infrastructure shake-up

By Mike Hayes27 January 2022

€14 million UK facility to examine how structures interact with the ground

A new state-of-the-art facility is set to change the way major infrastructure projects are undertaken, according to its creators.

A wide-angle view of the SoFSI facility. Picture courtesy Bristol University

The UKCRIC Soil-Foundation-Structure Interaction (SoFSI) facility has been developed by the UK’s University of Bristol, to help make infrastructure design and construction more resilient and cost-effective.

SoFSI will look at the interaction of infrastructure with the ground, specifically when subjected to dynamic loads, be they, for example, weather- or traffic-related.

The laboratory houses a 6m x 5m x 4m deep soil pit, as well as two large shaking tables, one with a 50-tonne capacity, the other a high-performance six-axis table (see the video at the end of the article). The facility will enable researchers to undertake close-to-prototype-scale experiments.

Industry meets academia

Open to both academic researchers and the construction industry, the facility was built with €14.4 million in funding from the Engineering and Physical Sciences Research Council (EPSRC).

As well as promising potential cost savings, experiments undertaken at the laboratory could also lead to reductions in the carbon footprint of high-value infrastructure projects, such as high-speed rail, bridges and offshore wind farms.

The lab has been designed for research into five core areas: nuclear power plant soil-structure interaction, high speed rail, offshore wind turbines, monopiles and pile groups, and integral bridges.

Dr Flavia De Luca, senior lecturer in Structural and Earthquake Engineering at the University of Bristol, said, “We’re investing in state-of-the-art testing facilities that will help cut the cost of building the infrastructure of the future.

“For example, high speed rail will require many new bridges to cross waterways, roads, and other rail lines. SoFSI has been designed to help us understand, among other issues, how the span of lower cost, minimal maintenance integral bridges can be extended so that new high speed railway lines would be faster to construct, cheaper to maintain, more resilient to climate change, and enable us to minimise resource requirements.”

Supporting documents

Click links below to download and view individual files.

 
UOB SOFSI aerials media.mp4 An overview of the SoFSI facility, including the large shaking table and deep soil pit Size: 152.7 MB Click to download
NEWSLETTER
Delivered directly to your inbox, Construction Technology Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
CONNECT WITH THE TEAM
Andy Brown Editor, Construction Technology Tel: +44 (0)1892 786 224 E-mail: andy.brown@khl.com
Eleanor Shefford Sales Manager Tel: +44 (0)1892 786236 E-mail: eleanor.shefford@khl.com
Latest News
Electric crawler crane new from Sennebogen
Sennebogen in Germany announces 653 E Electro Battery, a 50 tonne capacity telescopic boom crawler crane
How is Volvo utilising hydrogen technology?
International Rental News speaks with Toni Hagelberg, Head of Sustainable Power Systems and Carolina Diez Ferrer, Head of Advance Engineering programs at Volvo CE
Subscriptions drive rise in sales for Trimble
Technology firm sees revenue up for second quarter of 2022